Project Location San Tan Valley, AZ | Services Groundwater
Promenade Wells No. 1 and No. 2
People , Lauren Handley, Gary Gin
The water utility is entirely groundwater dependent, with 24 existing wells that produce an average of 400 gpm and are typically high in nitrates, arsenic, and/or TDS. Previously installed wells in the area were not sited or designed based upon hydrogeologic data. LRE Water was contracted by the water utility to utilize data-driven methods to site, design, and manage the drilling, installation, development, and testing of two new production wells. Through proper design, installation, and development, LRE Water was able provide the utility with two new water production wells that each have a specific capacity greater than 3,000 gallons per minute (gpm) and all water quality parameters meet drinking water standards.